komoot
  • Inspiratie
  • Routeplanner
  • Features
Inspiratie
Bezienswaardigheden
Duitsland
Noordrijn-Westfalen
Münster District
Roergebied
Ennepe-Ruhr-Kreis
Hattingen

Blankensteiner Schleuse

Blankensteiner Schleuse

Wandel Highlight

Aanbevolen door 658 van de 702 wandelaars

Bekijk de routes
  • Breng me hierheen
  • Wijziging voorstellen
loading

Locatie: Hattingen, Ennepe-Ruhr-Kreis, Roergebied, Münster District, Noordrijn-Westfalen, Duitsland

Beste hikes naar Blankensteiner Schleuse
Tips
  • "Although Bochum is not located in a water-poor area, it came in dry summers in the mid-19th century to" water alamies ", caused by the rapidly increasing population and the increasing civil engineering of the mines, which drained the groundwater The line had to be taken from the Ruhr via the watershed into the city, because only then could Bochum be adequately supplied with water, for which the city purchased a site on the Ruhr, where the groundwater from the gravel bed through clay pipes It was pumped into a collecting well and pumped 100 meters into a high tank in a pumping station of two steam engines, which lay on the edge of the Weitmarer wood, from where it got into the distribution network and the public water supply in Bochum could be started in 1871 managed by the gas station, resulting in the new name "Urban Gas and Wasserwe strength ".At the turn of the century, water production exceeded ten million cubic meters for the first time, with a supply area of ​​around 200,000 at the time. In 1904, the city concluded a contract with the Bochum Waterworks, which had just been commissioned, in which the supply areas of the two companies were defined. The municipal water production plants have now been continuously expanded. The construction of a new pumping station next to the Ruhrschleuse Blankenstein also served this purpose. This Stiepel turbine pump and hydroelectric power station went into operation in 1910 and was in operation after extensive modernization in 1996 until 24 November 2015. The drinking water was won over several rows of fountains with 74 wells, both groundwater and bank filtrate were promoted - last year, 14 million cubic meters of water.In the future, the operating site in Stiepel will be operated as a pure hydroelectric power station. For this purpose, the four turbines previously responsible for the drinking water will be dismantled in the building, and two more turbines required for power generation will be expanded more efficiently from autumn 2016 onwards. So far, they have produced up to 800 megawatt hours of electricity, in the future it will be 3500. It can supply 1,000 households a year. "Source: route-industriekultur.ruhr

    vertaald doorOrigineel tonen
    • 12 december 2016

  • Technologie die prikkelt. En het spookt hier en vandaag uit een oude tijd. Super goed. Nog volledig functioneel en in bedrijf.

    vertaald doorOrigineel tonen
    • 23 maart 2020

  • Landschappelijk een lust voor het oog !! Klein oud slot (bezienswaardig)

    vertaald doorOrigineel tonen
    • 3 september 2017

Maak een gratis komoot-account aan om nog 9 andere tips van insiders te krijgen.

loading

Locatie: Hattingen, Ennepe-Ruhr-Kreis, Roergebied, Münster District, Noordrijn-Westfalen, Duitsland

Meest bezocht in
  • Jan
  • Feb
  • Mrt
  • Apr
  • Mei
  • Jun
  • Jul
  • Aug
  • Sep
  • Okt
  • Nov
  • Dec
Weerbericht - Hattingen
loading